WeRead Powered by ReaderPub
The Great Thames Barrage cover

The Great Thames Barrage

Chapter 3: Remedies Proposed.
Open in WeRead

About This Book

An engineering proposal argues for construction of a barrage across the lower Thames between Gravesend and Tilbury to create a non-tidal inland reservoir and maintain consistent deep navigation to central London, eliminating dredging, tide-waiting, and grounding, and improving safety and loading operations. The pamphlet catalogs complaints about inadequate depth, delays, overlapping authorities, high costs, and hazardous navigation, critiques dredging and administrative reforms as insufficient, surveys analogous international proposals, and advocates dockisation with locks and sluices as a comprehensive remedy while discussing technical, economic, and operational implications.

Remedies Proposed.

The Royal Commission on the Port of London, the Board of Trade, as representing the Government, the Thames Conservancy, the dock companies and others recommend the deepening of the river by dredging as a remedy for (a), and as a partial remedy for (b) and (f). As to (c) no remedy seems to be proposed by either, but rather an increase of dues, or in lieu thereof a charge upon the rates of London through the London County Council.

Partly to amend (d) it is proposed by all the above authorities, except the Thames Conservancy, that a Port Trust should be created to control the river, instead of the present conflicting authorities of the Thames Conservancy, Trinity House, the City Corporation and the Watermen’s Company.

But as to (e) there is no suggestion of amendment, nor is it expected that the proposed deepening of the river will materially improve the dangerous navigation (g).