| South Reservoir. | Obispado Reservoir. | ||||
| No. | Quantities, in cubic meters: | No. | Quantities, in cubic meters: | ||
| Earthwork: | |||||
| Total excavation | ... | 34,000 | ... | 56,479 | |
| Placed in embankment | ... | 31,500 | ... | 7,255 | |
| Placed in spoil banks | ... | 2,500 | ... | 49,224 | |
| Concrete: | |||||
| Columns (including foundations) | 135 | 1,240 | 356 | 543 | |
| Primary beams | 135 | 440 | 374 | 462 | |
| Secondary beams | 670 | 515 | 1,252 | 576 | |
| Side-walls | ... | 1,255 | ... | 710 | |
| Roof slab | Square meters: 5,140 | 520 | Square meters: 10,206 | 1,020 | |
| Floor | 4,070 | 780 | 9,200 | 2,120 | |
| Parapet walls | ... | 90 | ... | 165 | |
| Total concrete | ... | 4,840 | ... | 5,596 | |
| Reinforcing steel bars | ... | Pounds: 387,000 | ... | Pounds: 380,000 | |
| Expanded metal in roofs, slabs, etc. | ... | Square meters: 5,691 | ... | Square meters: 10,490 | |
The total cost of these reservoirs, including valve-houses, by-passes, and the length of supply pipe where the by-pass joins, and including all engineering expenses, etc., but exclusive of the cost of lands, planting, fencing, and special work in connection with the formation of parks, was as follows:
South Reservoir: 394,000 pesos, or 10,368 pesos per million liters.
Obispado Reservoir: 375,000 pesos, or 9,375 pesos[7] per million liters.
These rates may be regarded as reasonable when taking into consideration the special difficulties of construction in Mexico, and the high cost of all imported material, on which heavy duties are levied.
The value of the materials alone in these reservoirs amounted to more than 70% of their total cost.
Table 8 shows analyses of the Estanzuela and San Geronimo waters, made in February, 1910, by Messrs. Ledoux, of New York City. The Estanzuela sample was taken at the valve-house of the South Reservoir, while that of San Geronimo was taken in Shaft No. 1 of the infiltration gallery when flowing at the rate of about 450 liters per sec. Both waters are absolutely free from turbidity.
| Estanzuela. | San Geronimo Infiltration Gallery. | |
| Total solid matter in solution | 209.00 | 305.00 |
| Organic and volatile matter | Not weighable. | Not weighable. |
| Analysis of Solids: | ||
| Silica | 10.5 | 12.0 |
| Iron and Alumina | Traces. | Traces. |
| Lime | 85.4 | 112.6 |
| Magnesia | 3.8 | 22.6 |
| Soda (Na2O) | 13.3 | 20.2 |
| Potash (K2O) | 2.0 | 1.9 |
| Sulphuric Acid | 24.4 | 11.5 |
| Chlorine | 2.0 | 2.8 |
| Probable Combination of Bases & Acid Radicals in the Solids: | ||
| Silica | 10.5 | 12.0 |
| Iron and Alumina | Traces. | Traces. |
| Sodium Chloride | 3.3 | 4.6 |
| Potassium Sulphate | 3.7 | 3.5 |
| Sodium Sulphate | 26.3 | 40.8 |
| Calcium Sulphate | 13.3 | 22.1 |
| Calcium Carbonate | 142.7 | 184.8 |
| Magnesium Carbonate | 8.4 | 49.8 |
| —— | —— | |
| 208.2 | 317.6 | |
| Nitrogen as Free Ammonia | 0.004 | 0.032 |
| Nitrogen as Albuminoid Ammonia | 0.006 | 0.022 |
| Nitrogen as Nitrites (N2O3) | 0.002 | 0.002 |
| Nitrogen as Nitrates (N2O3) | 0.100 | 1.85 |
| Total Hardness (as CaCO3) | 155.0 | 220.0 |
| Alkalinity (as CaCO3) | 121.0 | 180.0 |
The distribution system was begun in September, 1906, but the general lay-out of the mains was modified in July, 1907, in view of the division of the system into two services, for high and low pressure. Plate XIX shows in skeleton form the lines of the cast-iron mains. These are laid at the present time along routes containing houses (excluding wooden shacks) which can be served immediately. The distribution system is arranged to serve as follows:
| Estanzuela supply | 4,150 | houses. |
| San Geronimo supply | 8,600 | " |
| ——— | ||
| Total | 12,750 | houses. |
This represents, at the present time, a division of the city of 321⁄2% for the Estanzuela, and 671⁄2% for the San Geronimo supply. Of the area of the supply district north of Santa Catarina River, 57% will be supplied from San Geronimo and 43% from Estanzuela. The real development of the city, however, is northward in the area of the low-pressure supply.
The static pressure over the city in the two sections varies as follows:
| Estanzuela supply | 85 to 50 lb. |
| San Geronimo supply | 55 to 29 lb. |
The main supply pipe from the South Reservoir is 61 cm. (24 in.) in internal diameter, and this size allows ample provision for future extensions. The supply pipe from the Obispado Reservoir is 76 cm. (30 in.) in internal diameter. On this main, in Calle de Cinco de Mayo, at a distance of 320 m. from the reservoir, has been placed a 76-cm. (30-in.) Venturi meter, the recording apparatus being in the house on the side of the road. Both these supply pipes are carried well into the city, and from them the distribution mains are laid; these are 45.7 and 30 cm. (18 and 12 in.) in internal diameter, with intermediate sections of 15 and 10 cm. (6 in. and 4 in.). Along Calle de Cinco de Mayo, where the division between the two services takes place, two lines are laid, a 30-cm. for high pressure and a 38-cm. (15-in.) for the low pressure. A duplicate pipe, 30 cm. (12 in.) in diameter, is also laid in Calle de Dr. Coss. On Calle de Alvarez the low-pressure pipe is 61 cm. (24 in.), and the high-pressure, 45.7 cm. (18 in.) in diameter. Provision is also made for extending the range of the two services to other districts. Practically every block is provided with gate-valves to cut off the supply in any direction. On the 76-cm. main, 61-cm. (24-in.) valves are used, and are connected by tapers to the pipe. On the 61-cm. mains, 45.7-cm. (18-in.) valves are used. The actual frictional loss by reducing the valve being small, this method permitted the use of valves of a more convenient size. On all the larger valves there are 15-cm. by-passes fitted with independent gate-valves.
Scour-out pipes, 10 cm. (4 in.) and 15 cm. (6 in.) in diameter, are placed in various parts of the system, draining to the sewers. Air-valves, both double and single, are also placed at high points in different parts of the system.
Reducing Valves.—At four points in the system the mains are arranged so that the supply can be interchangeable. Fig. 15 shows the arrangement of the mains at the junction of Cinco de Mayo and Alvarez Streets, and is typical of the arrangement at the other points.
Each reducing valve is placed on a 30-cm. (12-in.) branch main between the two services. These valves adjust themselves automatically to the pressure required, after they have been properly regulated to the different pressures on either side. To allow repairs to be easily made, there are ordinary gate-valves at each end enclosed in the same pit. If necessary, as in case of fire, any part of the system can be changed into high pressure temporarily by closing the valves against the San Geronimo supply.
Table 9 gives the length of the mains as laid, and the number of valves.
| Diameter: | Length, in meters. | Number of gate-valves. | |
| Centimeters. | Inches. | ||
| 10.2 | 4 | 49,831.68 | 677 |
| 15.2 | 6 | 31,918.31 | 306 |
| 30.5 | 12 | 14,461.31 | 117 |
| 38.1 | 15 | 1,661.98 | 11 |
| 45.7 | 18 | 4,522.61 | 5 |
| 61.0 | 24 | 2,826.54 | 10 |
| 76.2 | 30 | 1,454.40 | |
| ———— | ——— | ||
| Totals | 106,676.83 | 1,126 | |
The pipes were all cast according to the British Standard Specification, in 3.65-m. (12-ft.) lengths, and were supplied by Messrs. D. Y. Stewart and Company, and Messrs. Dick, Kerr and Company, of Kilmarnock and London. The valves were all of standard design, faced with gun-metal, and were supplied by Messrs. Glenfield and Kennedy, Limited, of Kilmarnock, Scotland.
In the distribution system it is proposed to provide 200 fire-hydrants, by arrangement with the municipality, but only a few of these have been placed. The general type is a double hydrant for two 63.5-mm. (21⁄2-in.) streams. These are to be placed at the corner of every block in the business portion of the city; single-way hydrants will be used in the residential districts.
Laying Cast-iron Pipes.—Table 10 has been prepared to show what can be accomplished with Mexican labor in laying pipes. In this kind of work the labor was particularly efficient; after the gangs were once drilled into shape, the work proceeded systematically, and at very good speed. All the pipes, after being laid, were tested to 150 lb. per sq. in. in the presence of the Technical Inspector.
Table 11 gives the details of the excavation, the material, and the average cost, of laying about 106.6 km. of pipes.
House Connections.—The ordinary house connections, which are of 19-mm. (3⁄4-in.) galvanized-steel pipe, are connected to the mains by lead goosenecks and brass corporation cocks. The Company's obligation under the concession extended to the edge of the sidewalk, and at this point curb-boxes, chiefly of the Hays pattern, were placed; but, subsequently, owing to the metering of every house service in the city, the control of the Company extended to the meter, which, as a rule, is placed immediately inside of the house. Owing to the rapid deterioration of the house service pipes in some districts of the northern part of the city, where the soil is formed of decaying organic matter, it has been decided to use lead pipe entirely from the main to the meter.
Damage Due to Floods.—During the night of August 27th, the main 61-cm. pipe, under the river bed of Santa Catarina, at the point where the main entered the city, was destroyed for a distance of 130 m., due to the scouring away of a whole block of city property. The Venturi meter register chart at the South Reservoir showed that the break occurred a few minutes before midnight. The location of this pipe is shown by Fig. 5; its broken end was in proximity to an old bridge pier. Fortunately, at the time of the flood, the Obispado Reservoir works were completed, and the whole city was supplied with water from San Geronimo within 48 hours. As only about 1,500 services had then been connected, this delay was not serious; in fact, in the lower part of the city, the water in the mains was sufficient until the San Geronimo supply could be connected. To make a temporary connection to conduct the high-pressure water to the city, a 15-cm. steel pipe was placed above ground, on the line of the main, for a distance of 100 m. This pipe was supported by a cable, 30 mm. in diameter, and by timber trestles. By limiting the supply district, this pipe was of sufficient capacity to serve until the large main could be safely restored.
| Employees. | Rate for 10 hour day. Pesos. | Total No. men. | Total cost of labor. Pesos. | No. of pipes laid.. | Cost per linear meter. Pesos. |
| Foreman | 4.50 | 1 | 4.50 | ... | ... |
| Caulkers | 3.00 | 4 | 12.00 | ... | ... |
| Lead pourers | 2.00 | 2 | 4.00 | ... | ... |
| Lead melter | 1.50 | 1 | 1.50 | 20 | 0.498 |
| Pipe cutter | 2.00 | 1 | 2.00 | ... | ... |
| Peons | 1.00 | 12 | 12.00 | ... | ... |
| Water boy | 0.50 | 1 | 0.50 | ... | ... |
| —— | ——— | ||||
| ... | 22 | 36.50 | ... | ... |
| Employees. | Rate for 10 hour day. Pesos. | Total No. men. | Total cost of labor. Pesos. | No. of pipes laid.. | Cost per linear meter. Pesos. |
| Foreman | 4.50 | 1 | 4.50 | ... | ... |
| Caulkers | 3.00 | 5 | 15.00 | ... | ... |
| Lead pourers | 2.00 | 2 | 4.00 | ... | ... |
| Lead melter | 1.50 | 1 | 1.50 | 25 | 0.410 |
| Pipe cutter | 2.00 | 1 | 2.00 | ... | ... |
| Peons | 1.00 | 10 | 10.00 | ... | ... |
| Water boy | 0.50 | 1 | 0.50 | ... | ... |
| —— | ——— | ||||
| ... | 21 | 37.50 | ... | ... |
| Employees. | Rate for 10 hour day. Pesos. | Total No. men. | Total cost of labor. Pesos. | No. of pipes laid.. | Cost per linear meter. Pesos. |
| Foreman | 4.50 | 1 | 4.50 | ... | ... |
| Caulkers | 3.00 | 4 | 12.00 | ... | ... |
| Lead pourers | 2.00 | 2 | 4.00 | ... | ... |
| Lead melter | 1.50 | 1 | 1.50 | 35 | 0.287 |
| Pipe cutter | 2.00 | 1 | 2.00 | ... | ... |
| Peons | 1.00 | 12 | 12.00 | ... | ... |
| Water boy | 0.50 | 1 | 0.50 | ... | ... |
| —— | ——— | ||||
| ... | 22 | 36.50 | ... | ... |
| Employees. | Rate for 10 hour day. Pesos. | Total No. men. | Total cost of labor. Pesos. | No. of pipes laid.. | Cost per linear meter. Pesos. |
| Foreman | 4.50 | 1 | 4.50 | ... | ... |
| Caulkers | 3.00 | 4 | 12.00 | ... | ... |
| Lead pourers | 2.00 | 2 | 4.00 | ... | ... |
| Lead melter | 1.50 | 1 | 1.50 | 40 | 0.221 |
| Pipe cutter | 2.00 | 1 | 2.00 | ... | ... |
| Peons | 1.00 | 8 | 8.00 | ... | ... |
| Water boy | 0.50 | 1 | 0.50 | ... | ... |
| —— | ——— | ||||
| ... | 18 | 32.50 | ... | ... |
| Employees. | Rate for 10 hour day. Pesos. | Total No. men. | Total cost of labor. Pesos. | No. of pipes laid.. | Cost per linear meter. Pesos. |
| Foreman | 4.50 | 1 | 4.50 | ... | ... |
| Caulkers | 3.00 | 4 | 12.00 | ... | ... |
| Lead pourers | 2.00 | 2 | 4.00 | ... | ... |
| Lead melter | 1.50 | 1 | 1.50 | 45 | 0.196 |
| Pipe cutter | 2.00 | 1 | 2.00 | ... | ... |
| Peons | 1.00 | 8 | 8.00 | ... | ... |
| Water boy | 0.50 | 1 | 0.50 | ... | ... |
| —— | ——— | ||||
| ... | 18 | 32.50 | ... | ... |
| Employees. | Rate for 10 hour day. Pesos. | Total No. men. | Total cost of labor. Pesos. | No. of pipes laid.. | Cost per linear meter. Pesos. |
| Foreman | 4.50 | 1 | 4.50 | ... | ... |
| Caulkers | 3.00 | 4 | 12.00 | ... | ... |
| Lead pourers | 2.00 | 2 | 4.00 | ... | ... |
| Lead melter | 1.50 | 1 | 1.50 | 60 | 0.147 |
| Pipe cutter | 2.00 | 1 | 2.00 | ... | ... |
| Peons | 1.00 | 8 | 8.00 | ... | ... |
| Water boy | 0.50 | 1 | 0.50 | ... | ... |
| —— | ——— | ||||
| ... | 18 | 32.50 | ... | ... |
| Employees. | Rate for 10 hour day. Pesos. | Total No. men. | Total cost of labor. Pesos. | No. of pipes laid.. | Cost per linear meter. Pesos. |
| Foreman | 4.50 | 1 | 4.50 | ... | ... |
| Caulkers | 3.00 | 4 | 12.00 | ... | ... |
| Lead pourers | 2.00 | 2 | 4.00 | ... | ... |
| Lead melter | 1.50 | 1 | 1.50 | 100 | 0.082 |
| Pipe cutter | 2.00 | 1 | 2.00 | ... | ... |
| Peons | 1.00 | 6 | 6.00 | ... | ... |
| Water boy | 0.50 | 1 | 0.50 | ... | ... |
| —— | ——— | ||||
| ... | 16 | 30.50 | ... | ... |
| Employees. | Rate for 10 hour day. Pesos. | Total No. men. | Total cost of labor. Pesos. | No. of pipes laid.. | Cost per linear meter. Pesos. |
| Foreman | 4.50 | 1 | 4.50 | ... | ... |
| Caulkers | 3.00 | 4 | 12.00 | ... | ... |
| Lead pourers | 2.00 | 2 | 4.00 | ... | ... |
| Lead melter | 1.50 | 1 | 1.50 | 150 | 0.0574 |
| Pipe cutter | 2.00 | 1 | 2.00 | ... | ... |
| Peons | 1.00 | 6 | 6.00 | ... | ... |
| Water boy | 0.50 | 1 | 0.50 | ... | ... |
| —— | ——— | ||||
| 16 | 30.50 | ... | ... |
| Pipe Diameter | Thickness | Weight of Pipe | Cost/piece fob Monterrey | Lead | Oakum | Charcoal | Total Material Cost per m | ||
| cm | in | mm | kg | pesos | Weight kg | Cost pesos | Cost pesos | Cost pesos | pesos |
| 10 | 4 | 10.3 | 109 | 11.65 | 2.0 | 0.37 | 0.025 | 0.0525 | 3.30 |
| 15 | 6 | 11.1 | 163 | 15.74 | 3.7 | 0.67 | 0.0675 | 0.065 | 4.51 |
| 30.5 | 12 | 15.8 | 463 | 76.50 | 7.9 | 1.44 | 0.1225 | 0.1 | 21.35 |
| 38 | 15 | 17.4 | 680 | 79.36 | 10.6 | 1.94 | 0.175 | 0.12 | 22.30 |
| 45.7 | 18 | 19.0 | 871 | 90.28 | 13.4 | 2.42 | 0.2375 | 0.1375 | 25.42 |
| 61 | 24 | 22.2 | 1,261 | 117.60 | 18.8 | 3.42 | 0.335 | 0.175 | 33.20 |
| 76 | 30 | 25.4 | 1,946 | 199.05 | 24.5 | 4.42 | 0.44 | 0.2125 | 55.77 |
| Diameter of pipe: | Width of trench | Depth | Cubic meters per linear meter | Cost of excavation per lin. m | Back-filling and removing surplus | Total cost, excavation back filling etc. | Hauling per linear meter | Cost of laying per linear meter | Total hauling and laying per linear meter | Total excavation and laying, labor, complete | ||
| cm | in | m | m | Pesos | Pesos | Pesos | Hauling | Misc. | Pesos | Pesos | Pesos | |
| 10 | 4 | 0.55 | 0.90 | 0.50 | 0.60 | 0.18 | 0.78 | 0.0275 | 0.005 | 0.06 | 0.0925 | 0.8725 |
| 15 | 6 | 0.60 | 1.00 | 0.60 | 0.72 | 0.22 | 0.94 | 0.45 | 0.005 | 0.825 | 0.1325 | 1.0725 |
| 30.5 | 12 | 0.65 | 1.20 | 0.78 | 0.94 | 0.29 | 1.23 | 0.18 | 0.0075 | 0.1475 | 0.335 | 1.565 |
| 38 | 15 | 0.70 | 1.30 | 0.91 | 1.10 | 0.34 | 1.44 | 0.2725 | 0.01 | 0.19 | 0.4775 | 1.9125 |
| 45.7 | 18 | 0.80 | 1.40 | 1.12 | 1.34 | 0.41 | 1.75 | 0.2725 | 0.01 | 0.245 | 0.5275 | 2.2775 |
| 61 | 24 | 1.00 | 1.50 | 1.50 | 1.80 | 0.55 | 2.35 | 0.825 | 0.08 | 0.41 | 1.315 | 3.665 |
| 76 | 30 | 1.10 | 1.60 | 1.76 | 2.11 | 0.65 | 2.76 | 0.83 | 0.10 | 0.53 | 1.46 | 4.22 |
Note.—The above costs of earthwork are based on the following rates and percentages over the whole city:
| Earth, per cubic meter | 0.35 | pesos | 50% |
| Soft sillar | 0.75 | " | 20% |
| Hard sillar | 1.50 | " | 20% |
| Rock (chiefly conglomerate) | 4.00 | " | 10% |
| Diameter of pipe: | Total labor cost. | Materials. | Total cost per linear meter. | |
| Centimeters. | Inches. | Pesos. | Pesos. | Pesos. |
| 10 | 4 | 0.8725 | 3.30 | 4.1725 |
| 15 | 6 | 1.0725 | 4.51 | 5.5825 |
| 30.5 | 12 | 1.565 | 21.35 | 22.915 |
| 38 | 15 | 1.9125 | 22.30 | 24.2125 |
| 45.7 | 18 | 2.2775 | 25.42 | 27.6975 |
| 61 | 24 | 3.665 | 33.20 | 36.865 |
| 76 | 30 | 4.22 | 55.77 | 59.99 |
The flood destroyed about 1,200 houses in the neighborhood of the river. In a number of blocks the smaller mains were scoured away, but considerable salvage was done afterward, and, as it is the intention of the authorities not to permit rebuilding along the flood-path of the river, these mains do not require reconstruction.
The Company's obligations, as far as drainage is concerned, were limited to the removal and disposal of sewage, no provision being required for storm-water, which is allowed to find its way to the natural watercourses. Apart from that fact, however, the best system for a city like Monterrey, where rainfall for many months at a time is very scarce, is the strictly "separate system." In the design advantage was taken of the natural topography of the drainage district, which is almost an ideal one for a gravitation system of sewers, the general fall in all directions being northeast; it was also in this direction that the best available land could be obtained for disposal purposes.
Plate XX shows in skeleton form the general lay-out of the sewers. Two drainage districts are arranged, divided by Calle de Washington, which may be regarded as practically the center of the city, and each of these districts has an independent main collector connecting to the outfall sewer at the northeast extremity of the city.
The system has been designed so that extensions may be made and may cover any part within the city limits; the main collectors are large enough for the whole area when fully built up.
The sewers are designed on a very liberal basis, namely, on the assumption that when flowing half full the quantity to be dealt with will be 380 liters per capita per day, with a maximum rate of flow of 200 per cent. It was assumed that each house would be occupied by 7 persons and have a frontage of 121⁄2 m. The minimum velocities in the sewers, when running full, vary between 0.91 and 1.5 m. per sec., with the exception of a few blocks.
The minimum size adopted was 24.3 cm. (8 in.) in internal diameter. The sewers of diameters between 24.3 and 50 cm., are 0.91 m. (36 in.) long, and are of salt-glazed vitrified clay, imported from San Antonio, Tex.
Table 12 gives the details of the length of the various sewers laid.
| Diameter: | Kind. | Length, in meters. | |
| cm | in. | ||
| 24.3 | 8 | Fire clay | 38,332.85 |
| 25.4 | 10 | " | 16,400.69 |
| 30.5 | 12 | " | 7,953.15 |
| 38.1 | 15 | " | 4,850.56 |
| 45.7 | 18 | " | 2,023.40 |
| 50.8 | 20 | " | 1,450.53 |
| 55.9 | 22 | Reinforced concrete tubes, 6.9 cm. thick | 3,134.20 |
| 61.0 | 25 | Reinforced concrete tubes, 7.6 cm. thick | 357.40 |
| 68.6 | 27 | Brick and concrete | 484.05 |
| 76.2 | 30 | Brick and concrete | 662.69 |
| ——— | |||
| Total | 75,649.15 | ||
The greater number of the manholes are of brickwork, 23 cm. thick, and have concrete inverts. They have a diameter of 1.2 m., which is reduced to 0.61 m. at the top, and each is provided with a heavy cast-iron frame and closed cover weighing about 190 kg. There are 521 manholes, and they are placed at every block and on long lines about 80 m. apart.
The sewers are flushed with 15-cm. (6-in.) automatic flushing siphons of the Miller pattern with 20-cm. (8-in.) discharge pipes. There are 278 of these siphons, and they are placed in flush-tanks (Fig. 16) built of brickwork and plastered with 1:1 cement mortar. Their capacity varies from 800 to 1,200 liters, and they discharge from 221⁄2 to 281⁄2 liters per sec. They are timed to flush once in 24 hours.
The system is at present ventilated by 23-cm. (9-in.) steel ventilating columns (Fig. 16), with ornamental cast-iron bases. There are 220 of these columns. Most of them are 7.85 m. above the level of the edge of the sidewalk, and are connected to special 15-cm. branch pipes leading from the sewer on the outside of the flush-tanks. In the center of the city they are provided with extension lengths, giving a total height of 12 m.
Table 13 gives the particulars of the average distributed cost of laying the 75.6 km. of sewers.
| Kind of Sewer. | Internal Diameter of Sewers. | Cost of materials including 10 cm. (4 in.) branches every 41⁄2 m. Pesos. | Earthwork and Labor: | Total cost of sewer complete per linear meter. | |||
| cm. | in. | Average depth of sewer m. | Cost of excavation, including back filling, removing surplus, etc. Pesos. | Cost of labor in laying (including hauling, etc.). Pesos. | |||
| Fire clay | 24.3 | 8 | 2.00 | 2.10 | 3.46 | 0.21 | 5.67 |
| " | 25.4 | 10 | 2.78 | 2.25 | 3.97 | 0.2625 | 7.0125 |
| " | 30.5 | 12 | 3.64 | 2.50 | 4.705 | 0.305 | 8.65 |
| " | 38.1 | 15 | 6.14 | 2.75 | 5.50 | 0.4375 | 12.0775 |
| " | 45.7 | 18 | 8.80 | 3.00 | 6.745 | 0.645 | 16.19 |
| " | 50.8 | 20 | 11.30 | 3.50 | 8.275 | 0.815 | 20.39 |
| Concrete | 55.9 | 22 | 5.93 | 3.50 | 9.19 | 1.325 | 16.445 |
| " | 61.0 | 25 | 7.30 | 3.75 | 11.245 | 1.685 | 20.23 |
| One brick thick on concrete foundations | 68.6 | 27 | 7.17 | 3.75 | 11.735 | 3.93 | 22.835 |
| 76.2 | 30 | 7.925 | 4.00 | 14.53 | 4.515 | 26.97 | |
The house connections are chiefly of 10-cm. (4-in.) pipes, laid on a minimum gradient of 21⁄2%, from oblique branches on the sewer to siphon intercepting traps near the house, as shown by Fig. 17. From this trap a 10-cm. fire-clay inspection pipe is carried up and capped at the sidewalk level with a cast-iron box having a locked cover. From this inspection pipe a branch is connected to a cast-iron fresh-air inlet, in most cases set in the wall of the house, the inlet being 30 cm. above the level of the pavement.
Effect of the Flood on Sewers.—The flood of August 27th and 28th, 1909, partly destroyed one of the main collectors, which was laid along the banks of the river and encased in concrete. This has now been relaid farther north, and out of the way of any future floods. The total length of the new sewers replacing those damaged amounts to 1200 m., and they vary in internal diameter from 20 to 55.9 cm. (8 to 22 in.).
The direction of the main outfall sewer was determined after a thorough study of all the available land lying to the north and northeast of the city, as it was the intention of the Company to utilize for irrigation purposes the sewage and any surplus waters that might be developed. The best available site was found to be about 12 km. north of the city, a little northwest of the village of San Nicolas de los Garzas, as shown on Plate II. The long length of outfall required was justified by the cheap cost of the land and its excellent character for sewage irrigation. The sewer was designed for a capacity of 90,000,000 liters a day (36.76 cu. ft. per sec.) in order to allow for conveying surplus waters as well as sewage.
The outfall intercepts the two main branches of the city sewers at Calle de Allende and Calle de Tapia, and its total length is approximately 11,900 m. The chief type adopted is shown on Plate XXII. It is formed with an invert of radial bricks laid in 1:2 cement mortar, on a foundation of 1:3:5 concrete approximately 7 cm. thick. As the ground was chiefly in hard sillar, only a little concrete was required to mould the bottom to the correct shape. The arch was formed of special radial bricks, 15 cm. (6 in.) deep, laid in cement mortar. These bricks were adopted in preference to concrete, owing to the heavy cost of sand and rock, due to the long haul, and for the purpose of obtaining rapid work. Plate XXI shows the sewer arch, and one of the ventilating columns and manholes. The bricks were obtained from the local brick plant, and form a very satisfactory material for sewers, being well burnt, thoroughly hard, and absorbing not more than 71⁄2% of their weight of water. The contract prices for the labor on the brickwork were 1.25 pesos per sq. m., and 1.38 pesos for the arch.