Scale of feet. Fig. 10. Truss of Windsor Bridge. Transverse Section.

At about the same time that the Newport viaduct was reconstructed, Mr. Brunel designed the bridge over the Thames on the Windsor branch of the Great Western Railway. This is a very large example of the bow and string girder, the span being 202 feet, and the height of the truss 23 feet. The trusses are three in number, for two lines of way, the middle one being twice the strength of the outside trusses. The elevation of the Windsor bridge is shown in fig. 2, Pl. IV. (p. 206). The bridge is oblique to the river, being 20° off the square. To steady the arched ribs sideways a system of diagonal bracing extends over the whole of the top of the trusses, except at the ends, where headway has to be left for the trains.

A section of the arched ribs and of the roadway girders in the centre of one of the trusses is given in the woodcut (fig. 10). The arched rib, to resist compression, is of triangular section.[99]

 

The borings to ascertain the nature of the ground at the foundations of the piers were made in 1846, but it was not until 1848 that the works were commenced. Each abutment consists of six cast-iron cylinders, 6 feet diameter, which were sunk by excavating the gravel from their interior by hand dredging and by placing weights on the top so as to force them down.

When each cylinder had been by this means sunk low enough to ensure a good foundation, it was filled with concrete in the following manner. A mixture formed of Thames ballast and Portland cement, in the proportions of 8 to 1, was put into a canvas bag; this was lowered inside the cylinder to the bottom, and, by pulling a rope, the mouth of the bag was opened, and the concrete deposited under water in the bottom of the cylinder. Whenever the work was interrupted, great care was taken before recommencing it to clean off any deposit, in order that the new concrete might adhere well to the old. When the cylinder had been filled to such a height that there was no danger of its floating up when emptied, the water was pumped out. The inside was then filled with concrete in the ordinary manner. On the top were placed oak platforms, which support the trusses of the bridge.

One of the outside trusses was tested at Bristol in July 1849, by loading it gradually with iron rails, beginning from one end, until the whole truss was uniformly weighted with 270 tons, or 1½ tons per foot-run, observations on the deflection of different points of the bottom girder being made both during the loading and unloading. The results of this test were perfectly satisfactory.

The superstructure of the bridge was erected on scaffolding, and the line was opened on October 8, 1849.

 

It will be desirable here to notice one or two important features in this as in almost all Mr. Brunel’s bridges.

The ordinary permanent way was laid over the bridges with ballast of sufficient thickness to enable the road to be kept in repair in the same manner as the other parts of the line. As there was no change in the nature of the support given to the rails, no concussion was caused on a train entering or leaving a bridge. The ballast took off from the structure the vibration of the train; and, in the event of carriages or even engines getting off the line, it helped in a great measure to prevent their ploughing through the flooring. Where the flooring was of timber the ballast protected it from fire. Also in long bridges there was no necessity for any contrivance of sliding rails to allow for the effects on the structure of changes of temperature. On the other hand, the ballast added to the weight on the bridge. With the timber viaducts this was an advantage, since it kept the various parts of the framework in close contact, and prevented sudden jars being brought on them by the rapidly applied load of a passing train. Even on the large bridges the cost of the extra material requisite to support the weight of the ballast was more than compensated for by the advantages above referred to.

Mr. Brunel employed timber flooring, as being the safest in the case of carriages getting off the line, and also as being the cheapest. This flooring in the iron bridges was generally laid diagonally on wrought-iron cross girders, which were placed not at right angles to the line, but obliquely, in order that the two wheels of the same axle of an engine or heavy waggon might be on different cross girders at the same time. By this arrangement the cross girders could be made of less strength, and a saving effected in their cost and weight.

The bridge over the Wye at Chepstow, and the Royal Albert Bridge over the Tamar at Saltash, are the largest and most important of Mr. Brunel’s bridges.

They are remarkable not only for their dimensions, but also for the economical character of the designs, the form of their superstructures, and the methods by which the foundations of the piers were made.

At the part of the river Wye where it is crossed by the Chepstow Bridge, a cliff of limestone rock rises on the left bank to a height of 120 feet above the bed of the river, forming the precipitous edge of a broad table-land; while on the right bank the ground slopes gently for a considerable distance, rising only a little above high water, and is composed partly of clay and partly of loose shingle interspersed with large boulder stones. As it was necessary to leave a clear headway of 50 feet above high water for the navigation, the line on one side of the river is on an embankment of great height, and on the other side it penetrates the cliff about 20 feet below the top. The whole space to be bridged over, 600 feet wide, was divided into a river span of 300 feet, and three land spans of 100 feet each (see fig. 3, Pl. V. p. 206.) At one end of the great span a secure abutment was offered by the cliff of limestone rock; but at the other end, and under the piers of the smaller spans, the ground throughout was soft, and full of water. There was, however, rock at a depth of 30 feet below the bed of the river.

To reach this foundation with masonry, by means of a coffer dam, was almost impracticable, as it was 84 feet below high water.

The plan of building a stone pier on a foundation of piles was considered, and abandoned on account of the expense.

The method of sinking the cast-iron cylinders of the Windsor bridge has been already described. The pneumatic process of sinking cylinders had been introduced with great success at the Rochester bridge.

In this process the cylinder is closed at the top and air forced in by pumps until the water is expelled at the bottom. Workmen in the interior excavate the ground and remove any obstacles which prevent the cylinder from sinking, weights being added to force it down. As the air within is at high pressure, the workmen enter, and the materials are passed in and out, through an intermediate chamber, called an ‘air lock,’ fitted with air-tight doors. The pneumatic method was ultimately employed at Chepstow, to assist in sinking the cylinders.

Before he decided on the plan for the foundations, Mr. Brunel had an experimental cylinder made of cast iron, 3 feet in diameter, at the bottom of which was an exterior screw flange 12 inches broad, and 7 inches pitch, making one complete turn. This screw cylinder penetrated the ground like an ordinary screw pile. In one instance it was rapidly sunk to a depth of 58 feet, through stiff clay and sand, in 142 revolutions;[100] yet, on another trial, when boulders were encountered, there did not appear to be sufficient penetrating power. In one of these trials, the screw, having got into a bed of running sand, had no hold, and failed to descend. Mr. Brunel then had the cylinder partly raised, and another screw added at some distance above the lower one. It was then successfully screwed down.

Mr. Brunel, however, ultimately decided on forming the piers of cast-iron cylinders forced down by loading and afterwards filled with concrete, and the work was commenced in the spring of 1849.

With this form of construction all uncertainty of obtaining a secure foundation was removed, as the pneumatic method was in reserve, in case of excessive influx of water, to sink the cylinders to the rock, if it could not be reached by simpler means; and additional cylinders could be added, so as to obtain any amount of area of base that might be thought necessary.

The land piers for the 100 feet spans consist each of three cylinders, which are 6 feet in diameter, joined together in lengths of 7 feet. The main pier, which supports one end of the great truss, consists of a double row of cylinders, six in all, the lower parts of which are 8 feet in diameter, joined together in lengths of 6 feet. The bottom of each cylinder was made with a cutting edge, so as to penetrate the ground easily.

Most of the cylinders were sunk by the process of excavating the ground within them and weighting the top, the water being kept down by pumping. As the ground consisted chiefly of wet sand and shingle, danger was apprehended from its tendency to run in from the outside, while the excavation was in progress. This would have diminished the lateral stability of the cylinders; and great care was taken not to excavate too near the bottom, but merely to loosen the ground round the cutting edge and to force the cylinder down by weights. Stiff clay was sometimes used to prevent the wet sand and gravel from being squeezed in from the outside. When the cylinders had been sunk to the rock, and it had been dressed off to form a level foundation, they were filled with concrete in the same manner as at the Windsor bridge.

In sinking the cylinders of the main pier, much greater difficulties were encountered than with those of the land piers, owing to large boulders and pieces of timber being met with near the bottom. When still at some distance from the rock, a length of one of these large cylinders cracked, from its having met with an obstruction. Timber struts were then fixed within it, until the obstacle was passed, when it was strengthened by a strong wrought-iron hoop, and forced down to the rock.

In April 1851, when the greater number of the cylinders had been sunk, it was apparent that, from delays due to the influx of water and other causes, some of them could not be completed by the time that the superstructure would be ready. Mr. Brunel then decided to employ the pneumatic method, and by means of this apparatus some of the remaining cylinders were sunk. In the main pier four auxiliary columns, formed of 7-feet cylinders, were placed close to the others. They were connected to the 8-feet cylinders by strong brackets, and supplied a great additional bearing surface. Any slight inaccuracy of position in the cylinders was corrected by adjusting cones at the level of the ground; on these cones 6-feet cylinders were built up to the level of the railway.

The depth to which the cylinders were sunk and their position are shown in fig. 3, Pl. IV. From this drawing also the general form of the superstructure will be understood.

The bridge is for two lines of way; each line is carried between two longitudinal girders 7½ feet deep, of the section given in the woodcut, fig. 11 (p. 208). Each girder has a triangular top flange with a plate iron vertical web, and a slightly curved plate for the bottom flange. The roadway girders over the three land spans of 100 feet are in one piece, and are therefore continuous girders, 300 feet long, supported at two intermediate points. Those across the main span are also 300 feet long, and are supported by the main truss.

PLATE IV
IRON BRIDGES

IRON BRIDGES
[
Larger view]
[Largest view]

The truss for each line of way consists of two suspension chains, one on each side of the roadway, hung from either side of the ends of a horizontal circular tube, arched slightly for the sake of appearance, which rests on piers rising about 50 feet above the level of the rails. The pier at the land end is of masonry, and the upper part of the middle pier is of cast iron, resting on the cylinders already mentioned. Each pier has two archways for the trains to pass through. The chains carry the roadway girders at four points, and the tube is supported at two intermediate points in its length by upright standards resting on the chains. Thus, while the weight of the structure is supported somewhat in the same manner as in a suspension bridge, the inward drag of the chains is resisted by the tube. To prevent the framework from being distorted by unequal loading, it is made rigid by diagonal chains connecting the upper and lower ends of the two upright standards.

The main truss may be described as an inverted queen truss. The tube which has to resist the compressive strain due to the inward pull of the chains is 9 feet in diameter, and is made of boiler plate ¾ and ⅝ of an inch thick, stiffened at intervals by diaphragms. The chains are like those of suspension bridges, each formed of 12 and 14 links alternately, these being 10 inches deep, and varying from ¾ to 11/16 of an inch thick.[101]

At the ends of the tube, where the chains are connected to it, there are several thicknesses of plate, between which the links of the chains are introduced, and a round pin, 7 inches in diameter, passes through both plates and links. The strain is thus conveyed from the chains to the ends of the tube.

Though the trusses for the two lines of way are completely distinct, the tubes are braced together horizontally, to increase their stiffness sideways.

The woodcut (fig. 11) represents a transverse section of the truss for one line of way, and shows the circular tube with the internal diaphragms, the upright standards which support it, the roadway girders, and the chains.

Scale of feet. Fig. 11. Truss of Chepstow Bridge. Transverse Section.

In consequence of the great depth of the truss, which is about 50 feet, or one-sixth of the length, the strains on the several parts are comparatively small for such a large span.

The weight of wrought-iron work in each of the trusses of the main opening is 460 tons, inclusive of the longitudinal and cross girders, which weigh 130 tons.

At the points where the roadway girders are intersected by the inclined chains, they are not fixed to the chains, but rest upon them, rollers and saddles being placed between; and at the ends of the short horizontal links, in the middle of the span, there are screws for adjusting the level of the girders.

These arrangements were made in order that the roadway girders might not be strained by the slight alteration in the form of the truss which takes place when a load comes on the bridge.

The continuous roadway girders were, in the case of the large span, supported at six points, and in those over the three land spans at four points. As the strains on continuous beams, supported at so many points, had not at that time been fully investigated, Mr. Brunel had the subject carefully enquired into both by calculation and experiment, and was thus enabled to proportion the section of the girders to the strains at each point in their length. Some account of this investigation is given in the note at the end of this chapter.

As soon as the ironwork for the first truss was completed, it was put together parallel to the river bank close to the site of the bridge. The ends were supported on temporary piers, and the structure was uniformly weighted with a load of 770 tons, or 2¾ tons per foot run. In unloading it, the weight was taken off from one end of the truss, so as to test its strength when unequally loaded. The testing having been satisfactorily completed, the truss was taken to pieces, and preparations were made for erecting it.

It was necessary that the river traffic should not be interrupted for any long period; this circumstance materially influenced the nature of the design of the superstructure, which was such that no scaffolding was required in its erection, nor was there any interference with the navigation for more than a single tide. The truss was made so that it could be divided into parts, each of which could be lifted separately and quickly. For the operation of lifting Mr. Brunel determined to use chain purchases worked by crabs.[102] The tube was temporarily stiffened by portions of the main chains, arranged so as to form a truss. With this assistance it was able to carry its own weight when suspended by the two ends.

The preliminary operation of slewing the tube to its position on a platform at right angles to the river, was a work requiring a good deal of careful contrivance. When this had been accomplished, a pontoon, consisting of six wrought-iron barges, was placed opposite the end of the tube, and all was ready for floating it across the river.

The floating took place on Thursday morning, April 8, 1852. The tube had been rolled forward on two trucks till its end overhung the pontoon; and, as the tide rose, the pontoon floated with the end of the tube resting on it. In order to guide it in a straight line across the river, hawsers were attached to points on the bank up and down the stream, and were led to crabs on the pontoon, so that by hauling on either hawser the tube was kept in its right course. As spring tides at Chepstow rise 40 feet, there is a rapid current except for a very short time.

The operation of drawing the tube across was commenced at a little after nine o’clock, and by a quarter to ten the pontoon had reached the other side safely, and the tube spanned the river. All proceeded with perfect quiet and regularity under the management of Mr. Brunel, who was assisted by Mr. Brereton and Captain Claxton. As soon as the pontoon reached the further shore, the chains of the lifting tackles were attached to the tube. The tube was lifted in the course of the day to the level of the railway, and afterwards to its place on the top of the piers, when the suspension chains and the rest of the truss were attached to it. The bridge was opened for a single line of way on July 14, 1852. The second tube was floated in a similar manner to the first, and the bridge was completed shortly afterwards.

The total cost of the Chepstow bridge was 77,000l.[103]

 

The Royal Albert Bridge, which carries the Cornwall Railway across the River Tamar at Saltash, is the last and greatest of Mr. Brunel’s railway works.

A railway into Cornwall, crossing the river Tamar, was proposed as early as 1844. Mr. Brunel at one time thought of carrying the trains across on a steam ferry similar to those which had been successfully introduced by Mr. Rendel.

In 1845 a company was formed and an application made for an Act to construct the railway either with a steam ferry at Torpoint or by a bridge at Saltash. The latter plan was sanctioned by Parliament.

The height of the line shown on the section at the crossing of the Tamar was 80 feet above high water. The Admiralty, however, required that this height should be increased. No further steps were taken till the beginning of 1847, when some preliminary borings and sections were made, in order to prepare definite plans for the bridge. The facts then ascertained were so encouraging as to strengthen Mr. Brunel in his opinion that the difficulties to be encountered would not be found greater than had been anticipated.

The river at Saltash is 1,100 feet wide, with a depth in the middle of about 70 feet at high water. It had at first been intended to construct the bridge with one span of 255 feet, and six of 105 feet, with superstructures of timber-trussed arches.[104] In compliance with the requirements of the Admiralty, the design was altered to two spans of 300 feet, and two of 200 feet, with a clear headway of 100 feet. This arrangement would have required three piers in deep water. Mr. Brunel subsequently decided to have only one pier in deep water, and to have two spans of 465 feet each. It was afterwards found that these could be reduced to 455 feet.[105]

Twenty years before, while engaged with his father on the Thames Tunnel, he had conceived the idea of working under a diving-bell of great dimensions. Sir Isambard approved of the suggestion, and thought of applying it in sinking the shafts of the Tunnel. Drawings were prepared, but the circumstance of a patent for a similar idea having been taken out by Lord Cochrane partly deterred him from carrying out the project, though some sketches were afterwards made for constructing a lighthouse by means of this arrangement. When the construction of the Cornwall Railway had to be considered, Mr. Brunel thought that his old idea would be applicable to the difficulties to be encountered at Saltash.

Although the plan of using a large diving-bell was one which was nearly certain to be successful, Mr. Brunel thought it probable that a large cylinder of wrought iron could be constructed to serve as a coffer-dam, and that after sinking it through the mud, the bottom edge might be sufficiently water-tight to admit of the water being pumped out, and the masonry of the pier built in the ordinary manner.

A trial cylinder, 6 feet diameter and 85 feet long, was made, partly to ascertain whether or not this plan was practicable, but mainly for the purpose of thoroughly examining the site of the centre pier, where the surface of the rock was 80 feet below high water.

A strong framework was fitted on two gun-brig hulks, with powerful tackle for lowering and raising the cylinder. After it had been lowered to the bottom, five borings were taken within it, reaching through the mud to the rock. The cylinder was then shifted and similar borings made.

The positions of the borings, one hundred and seventy five in all, were carefully recorded; and thus a minute and accurate survey was obtained of the surface of the rock. The site of the pier was afterwards determined by means of a model constructed from these observations. In January 1849, when sufficient information had been obtained, the water was pumped out of the trial cylinder, and the mud excavated down to the rock. A short piece of masonry was then built, to demonstrate the practicability of building a pier in such a situation.

The expenditure of the Company for works of all kinds was shortly afterwards curtailed as much as possible, and no further progress was made for upwards of three years. However, information had been gained which proved that a masonry pier could be built in the middle of the river, on a good rock foundation which was there covered by a thickness of about 16 feet of mud.

During the suspension of the works, all the plans were revised, with the view of reducing the first cost wherever practicable; and Mr. Brunel decided not to make the bridge for a double line, even if there were money forthcoming to do so. His reason for this is given in the following report to the Board of Trade, made in 1852:—

This bridge had been always assumed to be constructed for a double line of railway as well as the rest of the line. In constructing the whole of the line at present with a single line of rails, except at certain places, the prospect of doubling it hereafter is not wholly abandoned, but with respect to the bridge it is otherwise.

It is now universally admitted that when a sufficient object is to be attained, arrangements may easily be made by which a short piece of single line can be worked without any appreciable inconvenience.... This will make a reduction of at least 100,000l.

In the summer of 1852 the designs of the bridge were matured, and by the beginning of 1853 the Admiralty had approved of them; the work of constructing the great cylinder for the centre pier was then commenced.

It was determined to provide for the possibility of having to employ the pneumatic process. The cylinder had a diameter of 35 feet at the bottom, and about 20 feet above the lower end of it a dome was made to form the roof of the diving-bell; from the centre of the dome rose a tube 10 feet in diameter to the level of the top of the great cylinder. As a diving-bell of this size, under 80 feet of water, might have proved unmanageable, an annular space, forming a gallery or jacket of 4 feet in width and 20 feet high, was formed round the inner circumference of the bottom of the cylinder below the dome. This annular space was divided by radial vertical partitions into eleven compartments, and was connected at the top by an air-passage with a 6-foot cylinder, which was placed eccentrically inside the 10-foot cylinder already mentioned, and served as a communication between the outside and the annulus. On the top of the 6-foot cylinder were placed the air-locks of the pneumatic apparatus which had been used at Chepstow. Thus air might be pumped into the annular space, the water expelled, and the work carried on without having to use air pressure under the whole of the dome. In that part of the 10-foot cylinder which was not occupied by the 6-foot cylinder a powerful set of pumps were fixed to keep down the water in the central space, and diminish the pressure under which the men worked, thus utilising whatever advantage could be gained from the great cylinder acting as a coffer-dam. As it had been ascertained that the surface of the rock dipped to the south-west to the extent of about 6 feet in the width of the pier, the bottom of the cylinder was made oblique, so as to fit the surface of the rock. These arrangements are represented in the transverse section of the great cylinder (Pl. V. p. 218).[106]

The great cylinder, having been constructed on the river-bank, was moved down to low water on launching-ways, and floated off by the rising tide. Guided between four pontoons, it was finally sunk in correct position in June 1854.

Some delay in penetrating the mud was caused by a bed of oyster shells, which had to be cut through by one edge of the cylinder. In consequence of some irregularities of the surface of the rock, the cylinder at first deviated considerably from an upright position; and it was necessary to use the pneumatic apparatus to gain access to the rock, and excavate it. The height of the annulus below the dome was such that it was not quite filled by the mud when the cylinder rested on the bottom. The work of getting the mud out of the annular space was much facilitated by the division of it into compartments.

By February 1855, the cylinder had been sunk to its full depth in an upright position, and it then rested everywhere on the rock, its lowest point being 87 feet 6 inches below high water.

Much trouble was given by a spring of water issuing out of a fissure in the rock, in one of the compartments, but the flow was stopped by driving close sheet piles into the fissure. The rock in the annulus was dressed, and the space filled by a ring of granite ashlar masonry which was built to a height of about 7 feet all round. The state of the work at this time is that represented in the section of the cylinder, (Pl. V. p. 218).

The rock consisted of greenstone trap, so hard that tools could with difficulty be got to work it. When the ring of masonry was completed, it was expected that the bottom might be sufficiently water-tight to act as a coffer-dam, and allow of the mud being taken out from the central part of the cylinder, below the dome. But the pumping power was not at first sufficient for this purpose, and it was thought that it would be necessary to employ the pneumatic process in this space also.

However, by rapid and incessant pumping the water was lowered so as to allow of the mud and rock being excavated, and the masonry in the central space built without having again recourse to the use of air pressure. The leakage water was conveyed to two wells, formed of cast-iron pipes built into the masonry, from which the water was pumped. The inner plates of the annulus were cut out, and the work in the centre which consisted of granite ashlar set in cement was thoroughly bonded into the ring of masonry already built. When the work was carried up to the level of the dome, both the dome and the internal 10-foot cylinder were cut out and removed. When the building had been carried up some height, the pump wells were filled with cement concrete, and the influx of water stopped. Finally, about the end of 1856, when the masonry was completed to the cap of the pier, the upper part of the great cylinder was unbolted and taken ashore, it having been made in two halves with that object. Thus the most difficult part of the undertaking was successfully completed.[107]

The centre pier of the Saltash bridge is, like many great engineering works, out of sight, and little regarded by any but professional men. The rest of the bridge forms a striking feature in a beautiful landscape, and its appearance is well known.

The whole length of the bridge is about 2,200 feet, and is divided into two great spans over the river of 455 feet each and seventeen side spans, varying from 70 to 90 feet, which are on sharp curves. The piers of the side spans, as well as the two large piers carrying the land ends of the main trusses, are of masonry. The masonry of the centre pier is 35 feet in diameter, and is carried up about 12 feet above high water level. On it stand four cast-iron octagonal columns, rising up to the level of the railway. The piers which support the ends of the great trusses are constructed with arched openings, through which the trains pass.

The transverse elevation of the centre pier (Pl. V.) shows the octagonal columns connected by cast-iron open-work, and the arched opening. The upper part of the centre pier is a cast-iron standard, and that of the land piers is of masonry cased with cast iron.[108]

The elevation shows the great height of the structure, the rails being 190 feet and the highest part of the truss 260 feet above the lowest point of the foundations.

The railway is carried over each of the smaller openings between two longitudinal girders, and over the main spans it is carried between similar longitudinal girders, which are suspended at intervals from the main truss.

PLATE V
THE ROYAL ALBERT BRIDGE

THE ROYAL ALBERT BRIDGE
[Larger view]
[Largest view]

Each truss consists of a wrought-iron oval tube, which forms an arch, and of two suspension chains,[109] one on either side of the tube, connecting its two ends. The rise of the arched tube above its abutments on the top of the piers is the same as the fall of the suspension chains below the same level. At eleven points in the length of the truss the chains are connected to the tube by upright standards, which are braced together by diagonal bars, in order to resist the strains due to unequal loading. The roadway girders are suspended from the truss at the upright standards already mentioned, and at an intermediate point between each of them.

The truss has the great depth of 56 feet in the centre; this conduces materially to the economy of the construction, as it diminishes the strain upon the principal parts, the tube and the chains, and so enables them to be made of smaller dimensions.

Fig. 12. Truss of Saltash Bridge. Transverse section. Scale of feet.

The woodcut (fig. 12) is a transverse section in the centre of the truss, showing the oval tube, the chains, the upright and standards, the roadway girders.

The tube is made oval in section with the greater diameter horizontal, in order that it may have stiffness sideways under the compressive strain, and that the main chains may hang vertically at such a distance as to leave room for the roadway between them. The tube is 16 feet 9 inches broad and 12 feet 3 inches in height. Each chain consists of two tiers of links, each tier formed of 14 and 15 links alternately. These are 7 inches deep and about 1 inch thick. The arrangements of the ironwork of the tube and its connections with the main chains are generally similar to those at Chepstow.

The truss may be described as a combination of an arch and a suspension bridge, half the weight being placed on the one and half on the other, the outward thrust of the arch on the abutments being counterbalanced by the inward drag of the chains.

The mechanical arrangement of the Saltash truss is similar to that of the one at Chepstow.[110] The tube, resting on standards, the railway passing beneath, the suspension chains hung from either side of the tube, the upright standards, and the diagonal bracing are common to the two structures.

The difference in the form of the two trusses is principally the result of the difference in the circumstances attending the construction of the bridges at Chepstow and Saltash. The design of the Chepstow truss was chiefly determined by the necessity of lifting up the separate parts of it under conditions of peculiar difficulty; while at Saltash the mode of floating and lifting the superstructure had great influence in the preparation of the design.

On Plate V. (p. 218) is given an elevation of one span of the Saltash bridge, and a general elevation on a smaller scale of the whole bridge.

The total weight of wrought ironwork in the superstructure of each span is 1,060 tons.[111]

The trusses at Saltash were not lifted in parts, as at Chepstow; for, as the river was divided by the centre pier into two openings, one of them could be left clear for the navigation, and each truss, with its roadway girders attached, could be raised to its position slowly and in one piece. The trusses were constructed parallel to the river on the Devonshire side, close to the site of the bridge. When the truss for the Cornwall or western span was completed, temporary piers were erected to support the ends, and the scaffolding having been removed, the roadway was loaded with 1,190 tons, uniformly distributed.[112]

This test having proved satisfactory, preparations were made for floating the truss. Docks were made underneath it near the two ends, and in each of these docks two iron pontoons were placed. Valves were then opened to admit water, and the pontoons were allowed to sink on timbers prepared to receive them.

Upon each pair of pontoons was erected an elaborate framework of timber to carry the weight of half the truss, or between 500 and 600 tons. The framework consisted of stout timber props, some of them 40 feet long, extending from the pontoon to the arched tube, and was attached to the tube by iron suspension rods, so that when the operation of floating was completed, the pontoons would be free to pass from underneath the truss.

 

Mr. Brunel had previously taken part in operations of this nature. When Mr. Robert Stephenson was about to undertake the floating of the tubes of the Conway and Britannia bridges, he asked his friends Mr. Brunel and Mr. Locke to give him their assistance. They were present at all, or nearly all, these difficult operations, and Mr. Brunel had an active share in the work, especially in the floating of the first Conway tube. By Mr. Brunel’s advice Mr. Stephenson had obtained the services of Captain Claxton to superintend the nautical part of the work; and Captain Claxton was, as a matter of course, with Mr. Brunel in a similar capacity at Chepstow and Saltash.

At Saltash fortunately there was not so swift a tide as there had been at the Britannia and Conway floatings.

In order to haul the truss out, warps were laid from the pontoons to a gun-brig hulk near the centre pier, and to a barge higher up the river. On this barge were also placed ready for use the ends of four warps, leading to capstans and crabs on board vessels moored at various points. To keep the truss from being drifted up or down the river while being moved out, radius lines were laid from the pontoons to moorings, with arrangements for hauling in on them if required.

In order to ensure his directions being clearly understood and promptly attended to, Mr. Brunel assembled a number of his assistants, one of whom was placed as ‘Captain’ in each of the vessels containing the hauling capstans, to superintend the men, and to execute orders. These orders were given by signals.

It was most important that the attention of the captain should not be diverted by looking out for the signals, and that there should be no chance of a signal not being seen by him because he was attending to some other of his duties. There was, therefore, in each vessel an assistant whose sole duty it was to watch for the signals, to give the appropriate interpretation to the captain, and to acknowledge the signal by a flag corresponding to that by which it was given.

Mr. Brunel directed the operations from a platform in the centre of the truss. The signals were given from a smaller platform immediately above, and were made by red and white flags, held in front of black boards, which were turned towards the vessel signalled to. Printed papers containing instructions were distributed to all engaged; the signalling was carefully rehearsed, as also was every other part of the operations which could be tried beforehand.

 

September 1, 1857, was the day fixed for the floating. During the morning, the men, about 500 in number, assembled at their stations on the vessels and pontoons. Captain Claxton had command of the arrangements afloat, and as a reserve force to act in any emergency several boats were lent from H.M.S. ‘Ajax’ and the Dockyard. With Mr. Brunel were Mr. Brereton and Captain Harrison, the commander of the ‘Great Eastern.’ Mr. Robert Stephenson was expected, but a serious attack of illness prevented him from being present.

At about one o’clock in the afternoon signals from the tops of the temporary piers on which the truss rested, showed that the ends had been lifted three inches clear. Mr. Brunel then gave the signal for the men in the pontoons to haul on the warps, and the great structure glided slowly out to the centre of the river. A pause was then made, while the warps which were to swing the truss round into its place were being attached to the pontoon which was farthest from the centre pier. When this was done, the different ropes were hauled upon in obedience to signals, so as to keep the other pontoon close to the centre pier, upon which, as a pivot, the truss swung round in a quarter circle till it occupied the whole of the western half of the river, and was brought close to its appointed resting-place. It was finally adjusted to its exact position by strong tackles attached to the piers. Water was then admitted into the pontoons; and, as the tide fell, they were allowed to drift away, leaving the truss resting on the piers, the roadway girders being but a few feet above the water.

The whole operation was conducted with the most perfect order and regularity. The beauty of the scenery and the changing effect produced by the truss in the various positions it assumed as it was being moved forward and swung round into its place, rendered the operation as interesting to the spectators as its results were satisfactory to Mr. Brunel and to those who assisted him.[113]

 

In the task of lifting the truss, as well as in that of floating it, Mr. Brunel had the great advantage of the experience gained at the Britannia Bridge. There the piers were built first, and the tubes hauled up with link chains by hydraulic presses placed on the tops of the towers. The design of the piers at Saltash did not allow of this plan being adopted, and they were built up under the truss as it was lifted. Under each end of the truss were three hydraulic presses; the two outside presses combined, or the middle one by itself, were sufficient to lift the weight. Mr. Brunel had also at first intended to have strong screw-jacks, which were to be kept screwed up underneath the truss, and so to support the weight, if by any accident the presses failed. A modification of this plan was adopted; the rams of the presses had a screw thread cut on them, and a large nut on each was kept screwed up hard against the top of the press as the ram emerged from it. As an additional precaution, timber packing, in thin layers, was placed in the space between the completed portion of the pier and the end of the truss as it was lifted. Great care was thus taken to guard against any mishap.

The tube was lifted 3 feet at a time at each end. The operation went on slowly, in order to allow the masonry of the land pier to set after it had been built up underneath the truss. The work was carried on with great system and care under the immediate superintendence of Mr. Brereton. Mr. Brunel was only able to be present during one of the lifting operations, as he was then engaged in the launch of the ‘Great Eastern.’

 

By July 1858, the first truss had been lifted to its full height, and the second truss was ready for floating. The arrangements were generally similar to those on the previous occasion; the course, however, to be traversed by the pontoons was more intricate than on the previous occasion, as the land pier on the Devonshire side of the river, over which the first truss had passed, had been built up to receive the end of the second.

This truss had, therefore, to be moved first outwards till the pontoons were clear of the docks, then it had to move endways up the river, and to swing round into position. Mr. Brunel was obliged to remain abroad from ill-health, and Mr. Brereton conducted the operations. Although the weather was not favourable, and the wind high, the truss was safely landed on the piers; and was afterwards raised in the same manner as the first one.[114]

The general elevation, Plate V., shows the proportions of the bridge. On the Devonshire side, the side spans pass over fields, and on the Cornwall side over the town of Saltash.

The general effect of the bridge is in no way heightened by an expenditure of money on architectural ornament; for, with the exception of a few unimportant mouldings, the bridge is absolutely unadorned. The total cost was 225,000l.—a very moderate expenditure, especially when the difficult work at the centre pier is taken into account. This result is due not only to the careful manner in which all the details of the design were prepared, but also to the great attention given throughout to the construction.

His Royal Highness the Prince Consort, as Lord Warden of the Stannaries, permitted the bridge to be called the Royal Albert Bridge, and consented to open it in person. The ceremony was performed on May 3, 1859. Mr. Brunel was compelled to be absent on the Continent, for the sake of his health, and was represented on the occasion by Mr. Brereton.

After Mr. Brunel’s return to England, he paid a hurried visit to the Cornwall Railway, and, for the first and last time, saw in its completed state the great work on which he had expended so much thought and care.

NOTE, (pp. 182, 194, 209).

Experiments on Matters connected with Bridge Construction.

No account of the structures designed by Mr. Brunel would be complete without a reference to the elaborate care he always took, wherever it was practicable, to satisfy himself by experiment of the qualities of the materials employed, and of the correctness of the principles followed. It would not here be possible to give a detailed record of all his experiments, but an account of some of the methods employed by him will be interesting.

Some of the larger of Mr. Brunel’s experiments on cast and wrought-iron girders have already been mentioned.[115] He scarcely ever made any large girder or framework without having it fully tested, and he made extensive and elaborate experiments, most of them on a very large scale, on the strength of some of the materials and component parts of his different structures.

Among the large scale experiments tried by Mr. Brunel, were those on the compressive strength of yellow pine-timber, which were made at Bristol in 1846, and were on specimens from 10 to 40 feet in length, and from 6 to 15 inches square. A framework of four upright pieces of whole timber, nearly 50 feet high, contained four strong bars of wrought iron, placed vertically, and attached at their lower ends to the cylinder of a hydraulic press. Along these bars, a casting could be moved, and fastened at different heights by keys, in such a manner as to have its under-surface, which was planed, perfectly horizontal. The ends of a specimen having been made exactly square to its length, it was put in this apparatus, with the upper end bearing against the lower surface of the movable casting, and the lower end resting on the top-surface of the ram of the hydraulic press, which was also planed and adjusted so as to be horizontal. The keys, which attached the movable casting to the bars, were now driven tight, and the pump of the press worked, weights being placed on the end of the lever, to correspond with increments of pressure on the ram. These weights were added gradually, until the specimen gave way. The accuracy of this mode of measuring the pressure was tested by direct loading of the ram with rails, which was repeated several times during the course of the experiments, so as to guard against any change in the amount of friction of the press. For each increment of weight, the compression of the specimen was measured on its four faces, and its deflection, or amount of bending, on two adjacent faces. The transverse stiffness of long specimens was also tried, by supporting them at each end, and loading them in the middle. The deflection in the middle thus observed corresponded very closely with what might have been expected from the observations on the direct compression; and from the constants so obtained, the strength of those specimens, whose length was very great as compared with their transverse dimensions, could be obtained by Euler’s theory, but for the stouter specimens the strength per square inch was found to be nearly constant. From these experiments, a complete practical knowledge of the properties of yellow pine timber, when subjected to end pressures, was obtained, knowledge new at the time, and almost essential to Mr. Brunel in designing the many viaducts which he afterwards constructed.

Mr. Brunel also made experiments on the strength of pine timber when exposed to pressure on the side or at right angles to the fibre. By this means he determined the area which it was desirable to provide for the washers of bolts, and the weight which might safely be placed on transverse timbers or sills of viaducts.

Mr. Brunel’s experiments on riveting were also important. Most of these were made with specimens 20 inches wide, and half an inch thick. They were compared with specimens of solid iron, of the same quality and thickness as the riveted specimens, and also the same width minus the rivet holes, so as to have equal efficient sectional areas. Double covering plates and double riveting were used in all cases, the variation being in the widths of the covering plates, and the number and arrangement of the rivets. The experiments were continued until thirty in all had been made, and the strongest form of joint was considered to have been arrived at.

In connection with the lifting of the parts of the Chepstow Bridge, an elaborate series of experiments was made on ropes, chains, and wire-rope, so as to ascertain which of these it was desirable to employ, as possessing the greatest advantages. The experiments made were of two kinds, one to determine the absolute strength of the specimen when subjected to a straight pull, and the other to observe what took place when it was worked over a sheave. In the first set the specimen was held at each end in the jaws of a pair of wrought-iron clamps, which were tightened up by means of screws. One of the clamps was attached to a fixed beam, and from the other was suspended a large cylindrical tank, which was gradually filled with water until the specimen gave way, the breaking strain being the weight of the tank and water. This weight was ascertained by actual weighing with a steelyard when the water in the tank was at different heights. Observations on the extension, shrinkage of the circumference, and change in the pitch of the spiral of the rope were made with different loads, and the strength of a sufficient number of the yarns of which the rope was composed was tried to ascertain the loss of strength by combining the yarns into a rope. In the second set the specimen, clamped as before, was passed over a sheave, the axle of which rolled horizontally on planed cast-iron plates, in order to diminish friction. To each clamp was attached a cylindrical iron tank. Water being admitted to the highest tank until downward motion commenced, its influx was stopped, and the tank descended, the other one rising. Water was then admitted to the now highest tank until motion again commenced, and this process was repeated until the specimen gave way, the tanks getting fuller of water at each movement, at which times the difference of weight of the two tanks was observed. This, minus the slight friction of the apparatus, represented the rigidity of the rope. The extensions were observed as in the first set of experiments.

The specimens consisted of hemp, manilla, shroud laid and hawser laid ropes, from 8 to 10 inches in circumference, round and flat wire ropes, and chains of different sizes of about the same strength as the ropes. The sheaves also were of different diameters. These experiments resulted in Mr. Brunel deciding to use chains for lifting the bridge, and this mainly from the circumstance that chains work more satisfactorily over a sheave than either hemp or wire ropes.

Some small scale experiments made by Mr. Brunel are deserving of notice. These were made to verify calculations on the longitudinal girders of the Chepstow truss, which are virtually continuous beams of five unequal spans. It was desirable to test the results of analysis by experiment, in order to be assured that no errors had been committed in its application. Mr. Brunel accordingly devised the following simple form of experiment for this purpose. A deal rod, exactly half an inch square and 38 feet long, quite free from knots, was supported on props of equal height, above the perfectly horizontal and planed surface of a large beam of timber. The props were placed so as to correspond relatively to the actual spans, and the rod was loaded uniformly by means of a chain. It was thus bent into an elastic curve, the ordinates of which were very carefully measured, at every foot along the length, by a finely divided scale and magnifier. The pressure on each prop was also determined, by removing any particular one, and suspending the point of the rod immediately over it to a steel-yard, the weight being observed when the point of the rod was exactly at the same level as before the prop was removed. The obvious condition, that the sum of the pressures on the props should be equal to the weight of the rod and its load, furnished a satisfactory means of testing the results of these weighings. The rod being turned over on each of its four sides, the experiments were repeated, and the average taken, in order to eliminate the effects of initial curvature, or of unequal elasticity. Diagrams of the elastic curves were then made, showing the correspondence of theory with experiment, and this was so close as to leave no doubt that a true knowledge of the nature of the strains had been arrived at. One of these diagrams is given by Mr. Edwin Clark in his work on the ‘Britannia and Conway Tubular Bridges,’ vol. i. p. 462.

By modifications of the plan Mr. Brunel adopted in this experiment, the strains on continuous beams of varying section may be ascertained with considerable accuracy.

CHAPTER VIII.

STEAM NAVIGATION. THE ‘GREAT WESTERN’ STEAM-SHIP.

A.D. 1835—1847. ÆTATIS 30—42.